Large Pig Farm Project: One-Stop Pig Manure Treatment System

Large Pig Farm Project: One-Stop Pig Manure Treatment System

Large Pig Farm Manure Treatment System 

with 9 × 110m³ Aerobic Fermentation Tanks

As pig farming operations continue to expand, 

efficient manure management has become a key challenge for large-scale farms. 

Traditional manure handling methods often result in odor issues, environmental pollution, and high labor costs.

To improve manure treatment efficiency and achieve sustainable waste recycling, 

this farm selected JinDi's One-Stop Livestock Manure Treatment System 

to convert pig manure into organic fertilizer through a fully enclosed and automated process.

Composting towers of Large Pig Farm Project

Project Solution

JinDi provided a complete manure treatment solution 

covering manure collection, enclosed transportation, aerobic fermentation, and odor control.

Automatic Manure Collection

The automatic manure scraper system continuously collects manure from the pig houses

 and transports it to the manure conveying station.

This automated process helps:

Reduce labor requirements

Improve farm hygiene

Increase manure collection efficiency

Minimize odor generation inside the pig houses

Pig Manure Treatment System

Enclosed Manure Conveying System

The collected manure is transferred through a fully enclosed conveying system.

The hopper, pre-compression screw, sliding frame, and piston pump work together 

to deliver manure directly into the Manure fermentation tanks.

System Advantages:

Fully enclosed operation

Reduced odor emissions

No manure leakage

Stable and continuous conveying

Improved environmental performance

All manure-contact components are manufactured from SUS304 stainless steel 

for excellent corrosion resistance and durability.

Automatic Manure Scraper System for Pig Farms

Aerobic Fermentation Process

The project is equipped with 9 sets of 110m³ Fully Enclosed Aerobic Fermentation Tanks

providing efficient treatment capacity for large volumes of pig manure.

Inside the fermentation tanks, pig manure undergoes high-temperature aerobic fermentation. 

Beneficial microorganisms rapidly decompose organic matter under controlled conditions.

Pig Manure Composting Fermentation Tanks

Key Benefits

Composting cycle of only 7–10 days

High-temperature sterilization

Effective pathogen and parasite egg elimination

Stable fermentation performance

Fully enclosed and environmentally friendly operation

After fermentation, the manure is transformed into high-quality organic fertilizer.

JinDi Compost Tower for Livestock Manure Treatment

Deodorization System

To further reduce environmental impact, the project is equipped with a high-efficiency deodorization system.

The system collects and treats exhaust gases generated during the fermentation process, 

helping the farm maintain a cleaner environment and comply with environmental regulations.

Manure Fermentation Tank with Deodorization System

Project Results

Through JinDi's integrated manure treatment solution

the farm successfully achieved:

 Automatic manure collection

Fully enclosed manure transportation

Efficient odor control

Fast aerobic composting within 7–10 days

Conversion of pig manure into organic fertilizer

Environmental compliance and sustainable operation

Organic Fertilizer Production equipment

Conclusion

This project demonstrates how JinDi's One-Stop Pig Manure Treatment System 

helps large pig farms efficiently manage livestock waste and create value through organic fertilizer production.

From manure collection and enclosed conveying to aerobic fermentation and deodorization, 

JinDi provides reliable and customized solutions for modern livestock farms worldwide.


Online Message